Upper Coonamessett River Wetlands Complex Restoration Project
Pre-Restoration Water Level Below Bubbler Sept 2020
Description
Water Level Data Collected from below the bubbler September 2021 - April 2021. See 100% Basis of Design Report for methods and results.