Upper Coonamessett River Wetlands Complex Restoration Project

Upper Coonamessett 100% Basis of Design Report

Description

The purpose of this report is to document the studies completed and describe the designs proposed for the restoration of the Upper Coonamessett Wetland Complex in Falmouth, MA. This basis of design report (100% Complete Design) builds upon the Upper Coonamessett River Restoration Basis of Design Report (75% Complete Design) prepared by Inter Fluve in June 2023. In the sections below, we describe our understanding of the site conditions, review the existing data, describe the methods for field studies completed, and describe the proposed restored conditions that are informed by these findings. We summarize the design methodologies displayed in the accompanying final drawings and discuss the opinion of probable construction costs associated with the proposed restoration activities.

Versions