Cold Brook Cell 8 - Year 1 Post-contstruction
July 2024: Post-construction Photograph of Cell 8, looking south and showing the completed Cell 8. Note that the old Cold Brook channel to the right has been closed off at the extreme right hand side of the photograph. Another tidal creek has been constructed at the extreme bottom of the photo.
Massachusetts Division Ecological Restoration (Steve and Eileen Furlong) — Creative Commons Attribution 4.0 International