Eel River Headwaters Restoration Project

The Eel River Headwaters Restoration Project was completed in 2010 by the Town of Plymouth with state and federal partners. It was Massachusetts’ first full-scale cranberry bog restoration, transforming approximately 60 acres of former commercial cranberry farmland into self-sustaining freshwater wetlands and Atlantic white cedar swamp. The restored site is now managed by the Town as the Eel River Preserve, a 130-acre public property with about 3 miles of trails and 1.7 miles of free-flowing river. Public parking available for Eat River Preserve is located at Boot Pond Road and Long Pond Road, Plymouth, MA.

Restoration Actions


  • Removed Sawmill Pond Dam, two undersized culverts, and seven smaller barriers.
  • Reconstructed approximately 8,000 feet (1.7 miles) of stream channel.
  • Added 1,000 pieces of large wood for aquatic habitat.
  • Completed ~48,000 cubic yards of earthmoving to fill ditches and restore natural hydrology.
  • Planted 17,000 Atlantic white cedar saplings to restore a globally rare swamp type (temporary deer fencing was installed to protect young cedar trees from browse)


Outcomes


  • Restored natural groundwater and surface water connectivity.
  • Atlantic white cedars now exceed 15 feet in height and are naturally regenerating.
  • River herring have returned upstream of Long Pond Road after nearly 100 years of disconnection.
  • Early colonization by Drosera rotundifolia (round-leaved sundew) and other native wetland species observed.


Project Partners


  • Town of Plymouth (landowner)
  • Massachusetts Division of Ecological Restoration (DER)
  • Inter-Fluve, Inc. (design engineer)
  • SumCo Eco-Contracting (construction)
  • U.S. Fish and Wildlife Service (USFWS)
  • USDA Natural Resources Conservation Service (NRCS)
  • The Nature Conservancy (TNC)
  • American Rivers
  • Massachusetts Department of Environmental Protection (MassDEP)


Recognition


  • 2011 Coastal America Partnership Award, presented by the U.S. Department of the Interior.
  • 2018 Restoration Project Award, Society for Ecological Restoration (New England Chapter).


More information


  1. Massachusetts Division of Ecological Restoration — Eel River Headwaters Restoration (Plymouth) https://www.mass.gov/info-details/eel-river-headwaters-restoration-plymouth
  2. North and South Rivers Watershed Association — Eel River Preserve https://www.nsrwa.org/listing/eel-river-preserve/
  3. Inter-Fluve — Eel River Project Profile (Society for Ecological Restoration) https://interfluve.com/eel-river-ser/
  4. Inter-Fluve — Eel River Headwaters Restoration & Sawmill Dam Removals https://interfluve.com/2020/eel-river-headwaters-restoration-sawmill-dam-removals/?portfolioCats=78


Contributors

David Gould
Project Lead
Glorianna Davenport
Reporter

Institutions